Providing tailor made commercial solutions to suit any budget. From flush fronted veneer cubicles, to wall hung WC pans and granite work tops, we can provide a product at a price that suits.

Employing Carpenters and Plumbers, Shire can offer the full washroom installation service, including;

  • Solid grade and High Pressure Laminate cubicles
  • WC and wall duct panelling
  • Vanity units with associated top, including laminate, Corian and Granite
  • Sanitaryware installation and final plumbing connections
  • Other trades, such as flooring, ceilings and painting

More info

For further information on any of our projects, please contact us.

Commercial Projects

Recently, Shire were involved with the refurbishment of 3 toilet blocks at Bristol International Airport. Works were both landside and airside, including working during the night. The project involved the installation of new solid grade cubicles, wall panelling and Corian vanity units.

Associated sanitaryware was also installed along with watersaving sensor taps and urinal flushing controls. The project was completed over a short space of time, to a high standard resulting in a satisfied client, being able to re-open the toilets in time for a busy Easter period.

The panelling system utilised Trespa Virtuon as a core material, which provided a good hard wearing finish, but also had a featured light reflectance. Shire also had washroom shapes routered into the solid grade panels, which were then back-lit.

Bristol Airport

Shire were appointed by MB Construction to undertake the full refurbishment of the washroom's at Bristol Airport. This involved the three areas of work; Bar Zero 9, Baggage Reclaim (both Airside) and the Arrivals Hall. Part of the works involved the isolation of the existing services, then the full removal of the existing sanitaryware, panels and cubicles.

Shire appointed Formwise Washrooms to provide the panels, which were manufactured from Trespa Virtuon solid grade. Each washroom had full wall lining, with duct panels, fitted to the existing tiled walls. Shire undertook the installation of new Armitage Shanks sanitaryware, along with Dart Valley programmable sensor taps.

The project had a number of challenges, one of which were the constraints of working 'Airside', ensuring that all operatives were suitably trained and security cleared for such work to be undertaken. The project was also completed in a timely manner, prior to the Easter holiday busy period at the Airport.

Contract Value: £165,000

Back to top ↑

Shire undertook the washroom package for Avon and Somerset Police at Contact House in Bristol. Involving the installation of solid grade cubicles, WC back panels and solid grade vanity units, in combination with the installation of sanitaryware.

Final plumbing connections were also completed, along with the supply and fit of the washrooms accessories such as hand driers and soap dispensers.

Contact House, Avon & Somerset
Police

Shire were appointed by Midas Construction to undertake the washroom installation at the new Kenneth Steele House in the centre of Bristol. The works consisted of cubicles, duct panels, vanity units (with Corian tops), all provided by Amwell Systems. Shire also provided ambulant grab rail facilities within each cubicle block.

Contract Value: £32,000

Back to top ↑

Working with Wates Construction, Shire were appointed as the washroom installer at the Jacobs Engineering project at Winnersh Triangle in Reading. The work involved the installation of a high end cubicle system as manufactured by Amwell Systems Ltd, called Sylan. This involved the design of a flush fronted veneered cubicle system, along with associated WC duct panels.

To compliment the installation, Corian vanity units with integral Corian bowls & matching upstand were also fitted.

Jacobs

Wates Construction were the Main Contractor on this project. They approached Shire with the package for the full fit out of the washroom's of the project. The works consisted of the provision of full height Amwell Sylan cubicles, real wood veneer duct panels, cantilevered Corian trough vanity units and framework for the safety backed mirrors that were also supplied and fitted.

One of the challenges of this project, was to achieve the specific setting out that the Architect required, to ensure that all cubicles and wash basins lined through with the tile grout lines.

The Sylan cubicles that were fitted, were a very high end, quality looking product – finished in real wood veneer. The look of the cubicles were to provide a fully flush fronted system, with clean lines, and low maintenance.

Contract Value: £190,000

Back to top ↑

Aztec 500

Wates Construction were the main contractor for this project, who appointed Shire to undertake the washroom fit out of this project. The works consisted of full height duct panelling in real wood vaneer finish, manufactured by Amwell Systems, along with cantilever vanity tops finished in granite. Above each vanity unit, Shire constructed a stand alone frame that took full height safety backed mirrors.

Shire also undertook the sanitaryware on the project, consisting of wall mounted Armitage Shanks WC pans, and underslung vanity basins fitted with sensor taps by Dart Valley Systems.

  • All final plumbing connections, along with testing and commissioning were also completed.
Contract Value: £185,000

Back to top ↑

Next Distribution Centre

Midas Construction were appointed as Main Contractor on this project, and took on Shire to undertake the supply and fix of the cubicle system. The works consisted of Amwell Splash cubicles, complete with full height duct panels and matching vanity units.

Shire also undertook a special adaption to the duct panel system and cubicles, providing a fully enclosed single cubicle as a provision for a Muslim foot wash.

Contract Value: £25,000

Back to top ↑

Project Grace

Shire were appointed by Wates Construction to undertake the fit out of the washrooms throughout this refurbished building for the Solicitors Bevan Britten. The works consisted of Venesta full height duct panel system on a timber frame, complete with Centurion Resista cubicles. Shire also provided a bespoke Corian vanity unit within each room, fitted with a floating timber frame above that contained recessed paper towel dispensers. The rooms were then provided with full height 6mm safety backed mirrors bonded to the framework above the vanity units.

Complementary Document M facilities, including showers were also provided, along with Ambulant and Enlarged grab rail provisions within the cubicles.

Contract Value: £192,000

Back to top ↑

South Marston Park

Shire were appointed by Norwest Holst to provide the washroom facilities for the new building for Honda UK. The panel system was Splash, provided by Amwell Systems. This consisted of duct panels, vanity units and standard height cubicles. Norwest also requested from us, that the duct panels be hinged to allow ease of maintenance in the future.

The vanity tops were provided in Corian, which suited the client as they are very hard wearing and simple to maintain.

Contract Value: £24,000